How to Get a Business Sign Permit Approved
Learn how to get a business sign permit approved, including sign requirements, permit documents, UL information, drawings, and installation steps.
Need Pricing or Permit Specs for Your Sign?
Send brief project specs or permit questions—our US engineering team replies within 1 business day (8–10 business days production).
Jump to Section (7)

Opening a new location? You have a million things to do. But before you bolt that beautiful new sign to your storefront, you need one crucial piece of paper: The Sign Permit.
If you install a sign without a permit in the US, the city can fine you up to $1,000 per day or force you to tear it down.
Many business owners think getting a permit requires an expensive expeditor or attorney. It doesn’t. If you have the right documents from your manufacturer (that’s us), you can file it yourself and save hundreds of dollars.
Here is the exact 5-Step Process to getting your sign permit approved quickly.
❶ The “Before You Buy” Homework
1. Check Your “Zoning Code”
Every city is divided into zones (Commercial, Industrial, Historic, etc.). What to look for: Search your city’s website for “Sign Ordinance.” Key Limits: Max square footage (usually based on your storefront width), allowed projection (how far it sticks out), and illumination rules (some zones ban flashing lights).
💡 BASIS SIGN Tip Tell us your storefront width (e.g., 20ft). We will design your sign to fit the standard “1.5 sq ft per linear foot” rule common in most US cities.
2. Get Your Landlord’s Approval
City Hall won’t even look at your application without a Letter of Authorization (LOA) from the property owner. Action: Send your sign design to your landlord first. Get them to sign a simple letter saying “I approve this sign.”
❷ The Application Packet (The “Meat”)
This is where most people fail. The city needs specific technical drawings. You cannot just sketch it on a napkin. When you order from BASIS SIGN, we provide a “Permit-Ready Engineering Packet” containing the 3 Holy Grails of approval:
1. Professional Shop Drawings (The “Blueprints”)
We generate CAD drawings that show:
- Elevation View: What the sign looks like on the building.
- Section View: How the sign is attached to the wall (bolt size, depth).
- Electrical Specs: Where the power supply is located.
2. UL Listing Numbers
The inspector needs to know the sign is safe. Our packet includes our UL Manufacturing Number. This proves the sign meets NEC (National Electrical Code) standards.
3. Material Specifications
We list exactly what materials are used (Aluminum, Acrylic, LEDs) to prove they are weather-resistant and non-flammable.
✅ The Permit-Ready Packet Includes: Local sign shops charge $500+ just to create these drawings. At BASIS SIGN, we include them with your order.
❸ Submission & Timeline
Where to go?
- Small Towns: Walk into City Hall, “Building Department” or “Planning Department.”
- Big Cities (LA, NYC, Miami): Most now have online portals (e.g., “ePlan Review”).
How long does it take?
- Over-the-Counter: Some suburbs approve it same-day if your paperwork is perfect.
- Standard Review: 2 to 4 weeks.
- Historic Districts: 1 to 3 months (Avoid these if you are in a rush!).
How much does it cost?
Application fees range from $50 to $300 depending on the city and sign size.
What Happens After Approval?
Once you get the “Notice to Proceed,” you can install your BASISSIGN.
1. Install the Sign. (Use our template and Raceway Mount system).
2. Call for Final Inspection.
The inspector will come out to check two things:
- Is it securely mounted?
- Is the UL Label visible? (Yes, ours is right on the side).
3.Get Your Sticker. Congratulations, you are 100% legal.
Frequently Asked Questions
In most US cities, yes. Cities generally require a sign permit before a permanent exterior sign is installed, and illuminated signs also have electrical requirements. Rules vary by city and zoning district, so check your local sign ordinance or call the building or planning department before you order.
Most applications need a completed permit form, a landlord authorization letter, professional shop drawings (an elevation view, a section view showing how the sign mounts, and electrical specs), UL listing information for illuminated signs, and a materials list. BASISSIGN provides a permit-ready engineering packet with orders. Exact requirements vary by city.
Application fees typically run about 50 to 300 dollars, depending on the city and the size of the sign. Check your local fee schedule for any additional review or inspection charges.
Some suburbs approve over the counter the same day when the paperwork is complete. Standard review usually takes 2 to 4 weeks, and historic districts can take 1 to 3 months. Submitting complete drawings the first time is the best way to avoid delays.
A sign ordinance is your city’s zoning rule for signs. It typically limits total sign area (often tied to storefront width), how far a sign can project, and illumination, such as banning flashing lights in some zones. A common guideline is about 1.5 square feet of sign per linear foot of frontage, but confirm your city’s exact limits.
Usually yes. Cities generally want a letter of authorization from the property owner before accepting a sign permit application. Send your sign design to your landlord first and get a signed approval letter, which also confirms your lease allows the size and placement.
In many cases yes, if you have the right documents from your sign manufacturer. Small towns often accept applications at the building or planning department counter, while larger cities usually use online plan review portals. An expediter or attorney is not always required.
The city can issue fines and require you to remove the sign, which can mean losing the cost of both the sign and the installation. Penalties vary by city, so get approval before installation begins.
Inspectors need proof that an illuminated sign meets electrical safety standards, including the National Electrical Code. A UL listing and the manufacturer’s UL information show the sign was built and tested to those standards, which supports approval and the final inspection. See ourUL 48 certification guide.
You receive approval to proceed, install the sign, then call for a final inspection. Inspectors typically check that the sign is securely mounted and that the UL label is visible. Ourinstallation resources cover the mounting steps, and you canrequest a quote with permit-ready details.
Customer Support
Related Policy Technical parameters Downloads Installation FAQ
Explore Our Products
From signs, graphics, digital signs and everything in between – we’ve got you covered.
Explore Commercial Projects
See how BASISSIGN helps US contractors, franchises, and sign shops deliver flawless, UL-compliant signage while protecting their bottom line.
Don’t go to City Hall empty-handed
Make sure you have these 3 items before applying:
- Landlord Authorization Letter Template
- Technical Specification Summary
- Universal Permit Worksheet
×
Get Your Sign Permit Checklist
Enter your details below to receive the download link directly in your inbox.
Ready to start your hassle-free project?
Continue Reading
Related Signage Guides
Channel Letter Signs in Alpharetta, GA: Permit Rules, Timeline, and How to Order Factory-Direct
Ordering channel letter signs for an Alpharetta, GA business? See the city’s permit rules, the 45-business-day review limit, and factory-direct ordering.
Sign Permit Drawings: What Cities Actually Require (A Checklist With Real Examples)
What drawings does a sign permit need? See a real checklist from three jurisdictions, plus the documents, stamps, and mistakes that get applications rejected.
Channel Letters vs Light Box Signs: The Complete Guide to Choosing the Right Sign for Your Business
Channel letters or light box? Compare appearance, visibility, cost factors, durability, flexibility, installation and best use cases in this complete guide, then choose with confidence.